|
FRAME ASSEMBLY
|
(print on A4; click to enlarge photos) |
|
1 please check delivery against your order form.
2 bolt the leg plates to the ridge plates with the 35mm bolts and nyloc nuts. The checks in the leg plates must face the stops. Don’t over tighten.
|
|
3 bolt the legs to the ground rails with the 60mm bolts. Tighten, but not so as to flatten the tube.
|
|
4 lift the frame, splay the legs to the stops, and set in position across the prevailing wind
(see siting and anchoring page)
|
|
5 fill the ballast bags with sand or gravel, place under the ground rails, and toggle as shown, passing the toggle twice round the rails
|
|
6 if wind is forecast, hammer in the pegs as well.
If strong winds are forecast, remove the Dryer to
a sheltered position
|
|
7 the post kit. Thread the 4 no fittings/posts on the rails about 400mm from the ends, grub screws inwards, and dig post holes of 500mm. Set the Dryer square and level on blocks, pour concrete, and tighten the 8 no screws with the hex key.
We are keen to answer questions. Please email us or phone + 44 (0) 1680 812496. Or leave word and we will phone back as soon as possible.
|